Kalleward Group was utilized Design/Build project delivery to complete an extensive two-phase renovation of West Hills Athletic Club, a high use athletic facility owned by Western Michigan The 60,000 square foot renovation included new locker rooms, tennis courts, weight training rooms, aerobic rooms with specialized flooring, indoor running track with banked turns, cardio theaters, saunas, spas, and basketball courts. Also, administrative offices, childcare facilities, and concessions were redesigned and remodeled as part of the project. Through detailed logistical planning of the two construction phases, Kalleward was able to minimize disruptions faced by West Hills and identify design and construction solutions that saved West Hills.

Scroll to Top